![]() |
|||||||||||
| Signal System materializes Full-Automatic Control System adopting Micro-Processor Computer that promotes safety and convenience of passenger and makes rolling stock fast and accurate high speed transportation. | |||||||||||
ATP[Automatic Train Protection] System materializes function associated train safety.All defects should be found and conduce to constrained situation. |
|||||||||||
ATO[Automatic Train Operation] System automates general function done by driver and enables automatic & unmanned driving. |
|||||||||||
RF-CBTC[Radio-Frequency Communication Based Train Control] System controls train with real time wireless LAN communication and realizes Distance To Go & Moving Block System. |
|||||||||||
| We carry out not only research to secure and develop independent signal system but also interface design between signal device and vehicle. | |||||||||||
|
|||||||||||
|
|||||||||||
|
|||||||||||
|
|||||||||||


![]() |
Signaling System of Distance to go based on RF-CBTC |
|---|---|
![]() |
Supporting Automatic & Driverless Operation |
![]() |
Tachometer and Doppler Sensor, Guarantee of 0.2 ~ 0.5km/h Resolution of precision |
![]() |
Wireless LAN Communication & TAG, Real-time Location Detection |
![]() |
Block Design of Logic Block System, Deciding Train Track Occupation by WATC |
![]() |
Real-time & Continuous Information Transmission/Reception between Onboard and Wayside by Wireless Communication |

![]() |
Signaling System Design considering Characteristics of Wireless Communication |
|---|---|
| Safety and Availability System Safety by 2 out of 2 &Dual Composition of Main Facilities | |
![]() |
Transmission of Train Information by consideration of Driverless Operation to TTC |
![]() |
Train Moving Authority Generation & Driving Control based on Safety Logic of WATC |
![]() |
System backup Function by LCC Control during TTC failure |









